Bet they're pricey for the lecky they give but hey, you have to start somewhere.
Scaling up should reduce costs and being composite blades should be good on corrosion and maintenance. Found
this article, looks like they've been having problems with the 30kW version.
The local Cullivoe ice factory, which was supposed to be powered by the Nova 30 tidal machine along with an industrial estate and 30 homes, has switched off the connection because the turbine allegedly drained more energy than it generated.
But looking hopeful.